
GAE 9000 Track Removal Machine
The track removal machine GAE 9000 was developed to remove the two tracks and loading and carrying off ballast and excavated earth. The work is being done on one line while trains continue to run on the second.
Files:
The track removal machine GAE 9000 was developed and built by GTA on behalf of the Arlberg Tunnel consortium and has been in service since October 2007.